Work on Interstate 30 in Little Rock and North Little Rock involves weekly lane closures.
Weather permitting, the following travel impacts are expected to occur next week, beginning Monday, July 11. Double-lane closures on interstate lanes will generally be limited to 11 p.m. to 4 a.m. Traffic will be controlled by construction barrels and signage. Drivers should exercise caution when approaching and traveling through all work zones.
Daytime closures (8 a.m. – 5 p.m.)
I-30 frontage roads (single-lane closures) between 4th and 10th streets in Little Rock (6:30 a.m. start time)
Broadway Street eastbound (single-lane closure) between the frontage roads in North Little Rock
2nd Street westbound (single-lane closure) between Cumberland and Scott streets in Little Rock
3rd Street eastbound at Rock Street (corners of intersection closed) in Little Rock
Overnight closures (8 p.m. – 5 a.m.)
I-30 (single- and double-lane closures) between I-630 in Little Rock and I-40 in North Little Rock
I-630 eastbound ramp to I-30 eastbound (full closure) in Little Rock; ramp detour signed to exit to northbound frontage road
I-30 frontage road (single-lane closure) between 4th and 10th streets in Little Rock
Broadway Street eastbound (single-lane closure) between the frontage roads in North Little Rock
24-hour closures
Mahlon Martin (full closure) between President Clinton Avenue and 3rd Street in Little Rock; detours signed
3rd Street (full closure) between Ferry Street and Collins Street in Little Rock; detours signed
6th Street bridge (full closure) for reconstruction in Little Rock; detours signed to use the 9th Street bridge or 3rd Street.
Original Source can be found here.